Description
The Easy Solution to Your Spa Foundation!
The EZ Pad modules can be placed on grass, dirt, sand or gravel. For best results, remove sod and prepare a level base. Module can be drilled through for electrical conduit placement. You may use any size crushed rock up to 1 inch and/or pea gravel for leveling.
Each Box Contains:
- (4) 48” x 48” x 2” Modules
- (8) Black EZ Pad connectors
- (16) Phillips Pan head size 14, 1-inch screws
Tools Needed for Assembly:
- #2 Phillips head screwdriver or cordless drill with #2 phillips bit.
- Level
- Shovel
- 2 x 4 for leveling